If you read the Thanksgiving story on the Luca Architects journal, you know how it started. A turkey in a hard hat walked into the studio three days before Thanksgiving and asked for a house nobody could find. Mali drew it: one bedroom, no kitchen, raised above base flood elevation on stilts.
Then he came to see me.
“Luca drew it. Can you build it by Thursday?”
He put the drawings on the table and asked the question every builder hears sooner or later, just never this fast. I told him what I tell everyone: we should talk about Thursday.
I ran a construction company for about 25 years before I moved to Naples. I’ve heard a lot of schedules. This was the shortest.
Design-led, so nothing got lost
Luca Architects and Nello Build work together, so the drawings and the budget started at the same table. That’s design-led construction. He liked it. Fewer people to explain himself to.
Open book, every receipt
We build on cost plus a fee, open book. The owner sees every invoice and every receipt. He read all of them. Twice. He circled a $4 box of drywall screws and asked if it was gravy. It was not.

He also wanted three bids, which is smart. I sent him our guide on how to compare contractor bids. He came back with one question: does the low bid include stuffing?
Piles, permits and inspections
A house on a coastal lot starts below ground. Piles first, then the raised floor, then the walls. Impact windows, roof straps and a long list of inspections follow, because Southwest Florida builds for wind and water.
He asked if we could skip an inspection. Nobody skips an inspection. The inspector did ask why the owner kept hiding behind the porta-john.
He wanted a generator for storms. I pointed out that generators are loud, and the whole point was that nobody could find him. We put him on solar and a battery instead. It’s quiet, and nobody has to drive to the gas station the week of Thanksgiving.
The honest part about Thursday
You can’t permit and build a house in Naples in three days. Not on piles, not with impact windows, and not with the code changing on December 31. If you want the real timeline, read how long it takes to build a custom home in Naples.
So we did what a builder should do with an impossible deadline. We said so on day one, wrote a real schedule tied to permitting and lead times, and helped him find a safe place for this year. He’s spending this Thanksgiving in a golf cart garage in Old Naples.
Next Thanksgiving
Next year he’ll be up on the porch with a cranberry spritzer and a pelican for company, the solar panels quietly doing their job, and the whole family looking for him at ground level.

Nobody looks up on Thanksgiving.
Happy Thanksgiving from Nello Build.
If you’re planning a custom home, a renovation or a commercial fit-out in Naples, on Marco Island, in Bonita Springs or in Fort Myers, start a build or call (239) 686-1452. You’ll get a straight answer about Thursday.
Gino Torriero is a Florida Certified General Contractor (CGC1536213) and leads Nello Build in Naples. He was CEO of Nello Construction in Pittsburgh for about 25 years. No turkeys were harmed in the making of this schedule.